In the absence of an executed contract between parties, unless otherwise specified in another document, the following Terms and Conditions for Order Acceptance will apply:

01.

Background & Introduction

This Supplier General Quality Requirements document is defined as the basis of all quality agreements between all WELLER legal entities (“Buyer”) and WELLER suppliers (“Seller” or “Supplier”).

02.

Scope & Purpose

This document defines the general requirements relating to the quality of all products or services purchased by the buyer from the supplier during the term of any agreement including but not limited to purchase orders, global business agreements, or other terms and conditions documents referencing this document. Any deviations, exceptions or additional requirements shall be mutually agreed in writing between buyer and supplier. Specific quality criteria, targets and similar measures will be mutually agreed in product specific component quality plans , if not already defined in a product specification. When referenced by the applicable agreements, all of these requirements will comprise a complete quality agreement between buyer and supplier.

Buyer companies serve a variety of industries and business segments and as such, Buyer has unique supplier quality requirements specific to these industries and business markets. Processes and tools described in this agreement represent the core expectations and requirements of our business partners.

The terms of purchase transactions between Buyer and Supplier are governed by a general business agreement or terms and conditions checklist. If neither of these agreements exists the terms governing purchase transactions between buyer and supplier are the buyers’ standard terms and conditions, which are transmitted with every purchase order.

03.

Abbreviations and Definitions

A document certified by a competent authority that the supplied good or service meets the required specifications. This is also called certificate of conformance, certificate of conformity.

The system of methods, measurements, and analyses performed to demonstrate product conformity to requirements, ensure process conformity to requirements, and maintain or improve the effectiveness of the overall system. This system is a feedback loop of input to the management review, analysis of data, output of the management review, and implementation of corrective action.

 

04.

Supplier Requirements

Unless otherwise specified and approved by Buyer, the Supplier is required to have a Quality Management System (QMS) in operation aligned with or similar to ISO9001, ISO13485, IATF16949 or other QMS system. Accreditation by a third party certification body to the current version of QMS standard will be viewed more favorably by Buyer in supplier qualification criteria.

 

Risk: Supplier shall inform Buyer immediately if there is any possible risk related to reliability, function, safety or deviation from legal compliance related to Supplier’s product.

Performance Rating: Buyer may evaluate Suppliers business performance (quality, service, and cost of ownership) on a periodic basis and issue Supplier a supplier rating report.

Corrective Action: For those rated Suppliers who received unsatisfactory performance metrics, Supplier shall submit a written improvement plan within one month after receipt of rating report providing a roadmap and commitments on dates when Supplier will reach an acceptable rating.

 

Specific Quality requirements may be amended only with the written consent of both Parties.

Regulatory: Upon request, Supplier shall obtain all required regulatory approvals, and apply approbation marks accordingly, for products and manufacturing processes. Approvals shall be obtained and products marked, prior to first deliveries.

Safety: Buyer shall identify all relevant safety requirements and provide associated documentation for products designated for use in safety related applications. For other non-safety use related products, Buyer shall inform Supplier of the status of any product attributes Buyer deems important for safety considerations. Where product safety considerations or specifications exist from Buyer, Supplier must demonstrate specific control processes or qualification tests which include but are not limited to product validation, 3rd party qualification, and regulatory testing to guarantee 100% product compliance with Buyers’ safety considerations or specifications.

 

Supplier Certification: If Buyer requests a Certificate of Conformance (“COC”) that confirms the quality status of products and/or processes for each batch or any other interval, the requested COC shall be provided as requested prior to or with each delivery.

Packaging: Supplier shall comply with packaging regulations of destination including, but not limited to “requirements of Wood Packaging Materials.”

Product Change Notifications are required for all changes to production and prototype components affecting non-interchangeable form, fit or function and including, but not limited to, production performance, reliability, safety, appearance, serviceability, dimensions, tolerance, conformance to regulatory agencies, change of machinery, factory change, change of sub-suppliers, change of manufacturing process, etc.

Notification by Supplier shall be independent of the last delivery date. All PCNs shall be submitted in writing to WELLER Buyer. WELLER Buyer will submit all PCN’s to WELLER Program Manager and then the Program Managers will forward to applicable customer(s) based on customer requirements. PCNs must be provided 90 days prior to any change implementation. In case of Product Discontinuance, Seller shall provide written notice of planned Product Discontinuation.

Buyer has the right to conduct audits and inspections with respect to the manufacture, sale and delivery of Products, Environmental capability, and all other Seller activities in these requirements. At Buyer’s option, Buyer may conduct an audit or inspection itself or Buyer may select an independent third party to conduct the audit on Buyer’s behalf. If Buyer selects an independent third party to conduct the audit or inspection, Supplier may require that such independent third party execute a confidentiality agreement reasonably acceptable to Supplier.

Supplier shall, and shall cause its affiliates, suppliers, employees and agents to cooperate fully, at no additional charge to Buyer, in any audit or inspection conducted by or on behalf of Buyer.

Supplier shall immediately take all necessary or desirable corrective and preventative actions to resolve any issues discovered by any audit or inspection conducted by or on behalf of the Buyer.

Product approval by WELLER’S purchaser is required prior to first shipment of product in the following instances:

Supplier standard sampling level AQL is 0.65 unless otherwise defined by Buyer. Supplier standard Sampling plan shall be according to American National Standard ANZI/ASQC Z1.4-2003 “Sampling Procedures and Tables for Inspection by Attributes”or International Standard ISO 2859 “Sampling Procedure for Inspection by Attributes”, or Standardization Administration of the People’s Republic of China (SAC), subjected to the end-user of the product.

In cases where time is of the essence and Buyer must disposition the product, sorting and/or reworking costs performed by Buyer will be paid by the Supplier. If Supplier does not respond to Return Request for Defective Products within 3 weeks of request, Buyer reserves the right to dispose of rejected products with all disposal costs borne by Supplier.
  1. The Party that discovers the failure will promptly notify the other party;
  2. ThWithin three (3) business days Supplier will make an initial response to Buyer indicating its preliminary plan for diagnosing and addressing the problem;
  3. Supplier and Buyer will jointly exert all commercially reasonable efforts to communicate the problem and plan a workaround or more permanent solution;
  4. Supplier will perform its engineering change order procedure in appropriate circumstances for hardware problems originating in the manufacturing process;
  5. Supplier will prepare, consult, and cooperate with Buyer regarding an appropriate recovery plan as well as an appropriate workaround, as an interim solution, if one is needed; and
  6. Supplier and Buyer will mutually agree on a recovery plan.
Defective products verified as Supplier caused may, by mutual agreement between Buyer and Supplier, either be returned to Supplier or scrapped by Buyer. Rejected products shall be replaced or credited at Buyer’s option. Supplier shall provide immediate product replacement via the most rapid delivery method when significant rejected product quantities are involved.

05.

Responsibility

Changes to this procedure can only be made by approval from the Director of Engineering and the Quality Manager. Request for changes can be addressed to the team by anyone using this process.

It is the supplier’s responsibility to develop a contingency plan including all risks related to the environment, government regulations, natural disasters, labor dispute, etc. The supplier should also have a disaster recovery plan in case of an emergency disrupting the delivery of the product or services to WELLER.

It is the supplier’s responsibility to ensure that all persons working for the supplier are aware of:

06.

Inspection Data